The 35-story building on First Avenue was denied a new temporary certificate of occupancy by the Department of Buildings on Sept. 26 and has been operating without valid inspections since October, according to city documents.
(self.SWG_BASIC = self.SWG_BASIC || []).push( basicSubscriptions => { basicSubscriptions.init({ type: "NewsArticle", isPartOfType: ["Product"], isPartOfProductId: "CAowhIizDA:openaccess", clientOptions: { theme: "light", lang: "en" }, }); });
Skip to contentStay Informed with Buzz News | Your Daily Dose of Trending Topics
The 35-story building on First Avenue was denied a new temporary certificate of occupancy by the Department of Buildings on Sept. 26 and has been operating without valid inspections since October, according to city documents.